Electrical substation
150/30k, 90MVA
Location
Grotte Santo Stefano (VT)
SSE Martello
Design, Supply and Commissioning of the Protection and Control System (SPCC) of a 150/30kV, 90MVA electrical substation required for the connection of a large photovoltaic plant to the national grid.
The system consisted of:
-
Protection panels
-
SCADA system
-
UPDM/RTU panel for connection to the TSO Terna system