SSE Martello

Electrical substation
150/30k, 90MVA

Location
Grotte Santo Stefano (VT)

SSE Martello

Design, Supply and Commissioning of the Protection and Control System (SPCC) of a 150/30kV, 90MVA electrical substation required for the connection of a large photovoltaic plant to the national grid.

The system consisted of:

  • Protection panels

  • SCADA system

  • UPDM/RTU panel for connection to the TSO Terna system