Parco fotovoltaico Solar Italy II

Electrical substation
MT 30kV

Location
Tuscania (VT)

Parco fotovoltaico Solar Italy II

Execution of the following tests on 30kV MV lines:

  • Conductor resistance measurement

  • Verification of external sheath insulation

  • VLF test

  • Fault detection and location where identified